TNA Indonesia — POE Production Line, Jakarta
Complete POE sheet production line delivered March 2026
Project Photos




In March 2026, MOCO delivered a complete POE (Polyolefin Elastomer) sheet production line paired with an HCT-8 corona treater to PT. TNA in Jakarta, Indonesia.
**The project:**
- 4-roll calender (Φ400mm × 1800mm rolls, independent oil heating zone per roll)
- Lamination unit with precise nip pressure control
- Automatic slitting station + dual-station surface-center winding system
- HCT-8 corona treater (8KW, 25-40KHz, Siemens IGBT, ceramic electrode) for PE film surface treatment upstream of lamination
- Full electrical integration: Omron PID temperature control, Siemens PLC for line speed synchronization
- CIF Jakarta — sea freight, all-risk insurance, and Indonesian customs clearance handled by MOCO
- MOCO engineer on-site for 10 days: mechanical installation, electrical commissioning, operator training
**Timeline:** 8 weeks from initial inquiry to factory acceptance testing
**Results:**
- Production capacity increased by 30% (from 800kg/shift to 1,040kg/shift)
- Direct labor reduced from 4 operators to 2 per shift (fully automated winding replaced manual cut-and-wind)
- ±1°C temperature control accuracy across all four calender rolls — critical for POE sheet thickness uniformity
- HCT-8 corona treater achieved 42+ dyne/cm surface energy, eliminating adhesive failure at lamination interface
- Line was running production parts within 72 hours of equipment uncrating
- Customer saved approximately RMB 8,000/month in labor costs alone
**Contract:** RMB 73,000 — 30% deposit / 65% pre-shipment / 5% after commissioning sign-off